Project Description
- Water should be engaged before the machine started.
- Set the contact manometer to the test pressure.( the tube which is going to be test, must fill with water in outside. )
- Start to motor,
- Mechanical testing system is available under the machine. Set the pressure valve according to your test pressure,
- After test, stop the motor first than close the water valve.